My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00305
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:48:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153524
Contractor Name
Redlands Water and Power Company
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />northeast quarter of the Southeast quarter (NEt SEt) of <br />Section sixteen (16), Township one (1) South, Range one (1) <br />west of the Ute Principal Meridian. There are approximately <br />300 acres of land under irrigation ynder the power canal. <br />The water in the power canal is pumped to a height <br />of 127~ feet, through a pipe line approximately 1600 feet to <br />the intake of First Lift and Stub Ditch. Approximately 33 <br /> <br />acres are watered under the pipe line by direct use therefrom, <br /> <br />herein classified as from a lift ditch. <br />The First Lift Ditch flows in a northwesterly direction <br />from its said intake about 11 miles, and waters approximately <br />2250 acres of land. <br />The Stub Ditch also takes water out of the same discharge <br />of the pipe line, and is a lift ditch. It runs for a distance <br />of 2 miles, in a southeasterly direction, and waters approximately <br />166 acres of land. <br /> <br />At a point about 3.8 miles on the First Lift Canl, below <br />its intake, is located a substation that lifts the water 78 <br />feet and carries it through a canal about 6 miles long, in a <br />northwesterly direction, watering approximately 1025 acres. <br />At the beginning of the Second Lift is another substation <br />which lifts the water 50 feet and carries it a distance of <br />It miles in a southwesterly direction, irrigating approximately <br />100 acres. <br /> <br />At a point on the Second Lift, approximately 3 milea <br />below its intake, is located another Third Lift substation, <br />which lifts the water 50t feet and carries the water through <br />a canal approximately 3 miles, in a northwesterly direction, <br />watering approximatelY 350 acres of land. <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.