Laserfiche WebLink
<br />-- <br /> <br />Chapter V1- Selection of Alternative and Financial Plan <br /> <br /> <br />Table VI-7 Required Project Permits <br /> <br />Permitting Authority <br /> <br />Permit, Approval or Agreement Required <br /> <br />U.S. Army Corps of Engineers <br /> <br />Nationwide 404 Permit <br /> <br />Division of Water Resources <br /> <br />Approval of design <br /> <br />Water Quality Control Division <br /> <br />Construction Dewatering Permit <br /> <br />H. Benefits <br /> <br />If this project is not built and the reservoir asset is lost due to a possible breach order from the <br />State Engineer the loss would be borne by the Companys' shareholders. The total cost for replacing the <br />historic yield of 6,500 AF at a rate of $2,500/AF would be approximately $16,250,000. The total <br />estimated cost of this project at $328,000 is equal to approximately $501 AF of historical yield capacity <br />and $401 AF of stored capacity. <br /> <br /> <br />Horseshoe Dam No.2 Outlet Works Study <br /> <br />33 <br /> <br />BOYLE <br />