My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00304
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:48:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0027X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Grant
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- <br /> <br />Chapter V1- Selection of Alternative and Financial Plan <br /> <br /> <br />Table VI-7 Required Project Permits <br /> <br />Permitting Authority <br /> <br />Permit, Approval or Agreement Required <br /> <br />U.S. Army Corps of Engineers <br /> <br />Nationwide 404 Permit <br /> <br />Division of Water Resources <br /> <br />Approval of design <br /> <br />Water Quality Control Division <br /> <br />Construction Dewatering Permit <br /> <br />H. Benefits <br /> <br />If this project is not built and the reservoir asset is lost due to a possible breach order from the <br />State Engineer the loss would be borne by the Companys' shareholders. The total cost for replacing the <br />historic yield of 6,500 AF at a rate of $2,500/AF would be approximately $16,250,000. The total <br />estimated cost of this project at $328,000 is equal to approximately $501 AF of historical yield capacity <br />and $401 AF of stored capacity. <br /> <br /> <br />Horseshoe Dam No.2 Outlet Works Study <br /> <br />33 <br /> <br />BOYLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.