My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00304
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:48:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0027X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Grant
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />Chapter VI - Selection of Alternative and <br />Financial Plan <br /> <br />A. Narrative Description <br /> <br />Table VI-l shows a summary of the alternatives examined for the rehabilitation of the outlet <br />works and lists their advantages and disadvantages. Based on the client preferences, financial, <br />institutional and social impacts, Alternative 2 (Gate Chamber) was selected as the preferred alternative. <br /> <br />Table VI-l Comparison of Alternatives <br /> <br />Alt. Description Approx. Cost Advantages Disadvantages <br />I Upstream Gate $ Reliable design. No backup gate. <br /> Low maintenance cost. <br /> Fast construction. <br />2 Gate Chamber $ 303,000 Reliable design. Second highest cost for structural <br /> Low maintenance cost. alternatives. <br /> Fast construction. Longer construction period. <br /> Backup gate. Limited construction area. <br />3 Gate Tower $ Reliable design. Limited pool of qualified contractors. <br /> Low maintenance cost. Third highest cost for structural <br /> Backup gate. alternatives. <br /> Highest quality control required. <br />4 "No Action" $ 16,250.000 Low maintenance cost Highest cost overall. <br /> ($2,500 x 6.500AF Loss of valuable storage asset. <br /> yield to replace lost Los.s of agricultural water supply. <br /> water right with CBT <br /> water) <br /> <br />B. Hydraulic, Hydrologic, and Structural Design Criteria <br /> <br />Hydraulic design criteria are primarily limited to the sizing of the' outlet works. The maximum <br />discharge of the outlet works will be determined based on SEO guidelines presented in their "Dam <br />Safety Project Review Guide". The structural concrete in the gate chamber will have a 28-day <br />compressive strength of 4,000 psi and a maximum aggregate size of% inches. <br /> <br />Horseshoe Dam NO.2 Outlet Works Study <br /> <br />30 <br /> <br />BOYLE <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.