Laserfiche WebLink
<br />I <br /> <br />Chapter V - Evaluation of Alternatives <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Table V-3 <br /> <br />I <br /> <br />Construction Cost Estimate <br />Rorseshue Dam No.2 Outlet Works Project <br /> <br />I <br /> <br />Alternative 2 <br />Gate Chamber <br /> <br />I <br /> <br />I <br /> <br /> Estimated Unit Total <br />Work Quantity Cost Cost <br />Mobilization and Demobilization 1 Lumo Sum $8,700.00 $8.700 <br />Diversion and Care of Stream 1 Lump Sum 1.000.00 1.000 <br />Site Demoiition 1 Lump Sum 1.000.00 1,000 <br />Clearinn. Grubbino and StrioDinp 1 Lump Sum 1,000.00 1,000 <br />Furnish and Install 42-inch Welded Steel Sleeve Pine 150 Linear Feet 575.00 86,250 <br />Furnish and Place COOT Class 6 Road Base 25 Cubic Yards 10.00 250. <br />Furnish and Place Structural Concrete 25 Cubic Yards 1.500.00 37,500 <br />Furnish and Place Rlnran 500 Cubic Yards 20.00 10,000 <br />Furnish and Install Filter Fabric 725 Souare Yards 0.75 544 <br />Furnish and Install 42-inch Sluice Gate with Lift 1 Each 12.500.00 12.500 <br />Furnish and install Gate House 1 Lumo Sum 5.000.00 5,000 <br />Furnish and Install Miscellaneous Metalwork 1 Lumo Sum 500.00 500 <br />Bond Premiuml';) 1 Invoiced Cost 1.500.00 1.500 <br />Subtotal Construction Costs $165,744 <br />Construction Monitorinn Lumo Sum 32.000 $28,000 <br />Subtotal Construction and Engineering $193,744 <br />Contingencies @ 20% $38.749 <br />Total Estimated Cost $232,493 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Horseshoe Dam No.2 Outlet Works Study <br /> <br />28 <br /> <br />BOYLE <br /> <br />