My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00304
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:48:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0027X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Grant
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter V - Evaluation of Alternatives <br /> <br />Five factors were used to evaluate the alternatives which include: I) Project output/yield; 2) <br />Project costs; 3) Impacts on the man-made environment, the natural environment and the existing social <br />structure; 4) Financial feasibility; and 5) Institutional requirements for project implementation. The <br />reservoir impoundment will remain at the historic storage capacity of 8,051 acre-feet at reservoir <br />elevation 4975 for all the alternatives. The dam height will not be increased from the existing 35 feet for <br />any the alternatives. The following sections describe the project's output/yield, impacts and institutional <br />requirements. <br /> <br />A. Impacts <br /> <br />A.1 Man-Made Environmental Impacts <br /> <br />There will not be any environmental impacts to existing dwelling units, commercial facilities, or <br />other structures in the area. There are no utilities or roadways that will have to be relocated for the <br />project. There are no additional lands that would be inundated above the historical impoundment <br />elevation 4975. Construction staging will be limited to the existing parking area located on the left <br />abutment and below the normal high water elevation 4975 within the reservoir. <br /> <br />A.2 Natural Environmental Impacts <br /> <br />Impacts associated with the natural environment will include approximately 125 acres of the <br />historical reservoir area to be flooded. No additional areas above the historical reservoir elevation 4975 <br />will be flooded. <br /> <br />No additional impacts on streamflows will occur from the historical amount. The historical use <br />pattern will be reestablished upon completion of the project negating any water quality impacts after <br />construction. All federal, state and local regulations regarding water quality during construction will be <br />adhered to by the contractor. <br /> <br /> <br />Horseshoe Dam NO.2 Outlet Works Study <br /> <br />24 <br /> <br />BOYLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.