My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00302
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:48:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153681
Contractor Name
Elmwood Lateral Ditch Company, Inc.
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB95-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, '. <br /> <br />I. .' <br /> <br />.- , <br /> <br />CRSC-5, Page 2 <br /> <br />" <br /> <br />D. This O&M agreement shall be in effect through 2019 <br />(O&H Agreement termination date) vhich is 25 years after the <br />termination date shown in item 7 on the front side of Form CRSC-2. If the <br />completion date of the installation of the SRP's is extended, the <br />termination date of this O&H agreement vill be extended by the same length <br />of time, <br /> <br />II, OBLIGATIONS. <br /> <br />A. The Participant(s) viII: <br /> <br />1. Be responsible consistent vi th the O&M plan for operating and perform- <br />ing, or having performed, all needed maintenance of equipment or SRP's <br />installed or used in connection vith the SRP's required by the CRSC-2, <br />and vithout cost to USDA. The duties of the participant shall include <br />the replacement of the SRP's and any components thereof vhich have an <br />effective lifespan that ends before the end of the O&M agreement termi- <br />nation date as set forth in subparagraph I D above and any other costs <br />imposed upon the participants as specified in the provisions of 7 CFR <br />Part 702. <br /> <br />2. Obtain prior COC and SCS approval of all plans, designs, and <br />specifications for any alteration to the SRP's. <br /> <br />3. Prohibit the installation of any structure or facility that viII <br />interfere 'With the operation or maintenance of the SRP's and correct <br />any other condition under their control that interferes vith the <br />operation and maintenance of the SRP's. <br /> <br />4. Notify the COC of any agreement to be entered into vith other parties <br />for the operation or maintenance of all or any part of the project SRP's <br />and provide the COC and SCS promptly vith a copy of any such agreement <br />signed by the Participant(s) and other parties. <br /> <br />5. Provide COC and SCS personnel free access to the CRSC SRP's at any <br />reasonable time for the purposes of carrying out the terms of the agree- <br />ment and ensuring compliance vith this agreement and CRSC-2. <br /> <br />III. OPERATION AND MAINTENANCE PLAN (O&M PLAN). <br /> <br />An O&M plan on each SRP's included in this agreement has been attached to <br />and is a part of this agreement. <br /> <br />IV. INSPECTIONS AND REPORTS. <br /> <br />A. The participant(s) viII inspect the SRP's as specified in the O&M plan. <br />SCS, in its discretion, may provide technical assistance in the operation, <br />maintenance, and replacement of SRP's. <br /> <br />B. The COC or SCS may, at any reasonable time during the period covered by <br />this agreement, inspect the SRP's, related equipment and ilppurtenances as <br />veIl as the land in which any of the participants have an interest vhich <br />is benefited by the SRP's. <br />
The URL can be used to link to this page
Your browser does not support the video tag.