My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00302
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:48:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153681
Contractor Name
Elmwood Lateral Ditch Company, Inc.
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB95-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br /> <br />. <br /> <br />. <br /> <br />6. will the acquisition of ~dditional water rights be <br />necessary? <br /> <br />No <br /> <br />7. Please list the names and addresses of any technical or <br />legal consultants retained to represent the applicant or <br />to conduct investigations for the project" <br /> <br />None <br /> <br />8. List any feasibility studies or other investigations <br />which have been completed or are now in progress for the <br />proposed project. (Please submit one copy of each <br />completed study with this application); ~c.~ bE.Slif~ ZqZ~I/ <br /> <br />Mesa County ASCS Committee, 2754 Compass Drive, Suite ~~H/a <br />130, Grand Junction, CO. 81506, has prepared a -z..'1Z-dYtrl <br />preliminary cost, and is now working on the final design <br />stages. Z~Z - 'f /.3 "3 &,e; UVOIAJ; <br /> <br />Contacts with the Bureau of Reclamation has resulted in <br />correspondence (see attached letters) which indicates <br />that they are under the opinion that since the project <br />is not an "on farm" program, the 30% cast-sharing <br />portion does not come under the Salinity Control <br />Program and we have therefore sought this alternative <br />means of financing. <br /> <br />9. Estimated cost of the project, if known: $262,788.00 <br /> <br />The total cost is estimated at two-hundred and sixty-two <br />thousand dollars, seventy (70) percent of which is to be <br />paid by ASCS, and the remaining 30% ($78,788) to be paid <br />by the Elmwood Lateral Ditch Co., Inc. <br /> <br />A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.