My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00301
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:48:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />VIII. RECOMMENDED ALTERNATIVE AND ECONOMIC EVALUATION <br /> <br />A. Recommended Alternative <br /> <br />Spi 11 way Al ternat i ve No. 2 is recommended for construct i on for <br />severa 1 reasons. The fi rst bei ng the tota 1 cost of construct ion is <br />less with this alternative than with Alternative No.1. Also, the <br />capacity of the outlet works is increased significantly, as is indi- <br />cated by the two capacity curves shown on Figure A-4 in Appendix A. <br />The need for erosion protection with riprap will probably be less with <br />A lternat i ve No.2, as there is exposed bedrock in the mai n channel <br />below the outlet works. <br /> <br />The recommended Alternative No.2 will consist of the following: <br /> <br />1. Removal of existing spillway. <br /> <br />2. Construction of french drain along bottom of existing <br />spillway channel. <br /> <br />3. Backfill of existing spillway and spillway channel to <br />stabilize the slide area. <br /> <br />4. Construction of an emergency spillway near the existing <br />spillway. <br /> <br />5. Removal of portion of outlet conduit. <br /> <br />6. Construction of service spillway near the existing outlet <br />condu it. <br /> <br />- VIII-l - <br />
The URL can be used to link to this page
Your browser does not support the video tag.