Laserfiche WebLink
<br />/f" . <br />Io..-l <br /> <br />Q <br /> <br />2. Conveyor cause title to be conveyed to the State by deed <br />or other proper conveyance, subject only to the agreements <br />with the Farmers Home Administration of the United States, to <br />the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, for the following portions of <br />the proposed project facilities: <br /> <br />a. All water rights utilized in connection with the <br />proj ect. <br /> <br />b, A storage right for approximately 10 acre-feet, <br /> <br />c, Intake dam and approximately 1120 linear feet of 4- <br />inc~ raw water pipeline. <br /> <br />d, 80,000 gallon per day water treatment plant and appur- <br />tenance s . <br /> <br />e. Two shallow wells with pumps and discharge lines. <br /> <br />f. 100,000 gallon storage tank. <br /> <br />g. All lands, easements and rights-of-way necessary for <br />the foregoing structures. <br /> <br />3. Permit periodic inspection of construction by the autho- <br />rized representatives of the State during construction and <br />permit the state to review and approve or disapprove any <br />contracts for the construction of the project. <br /> <br />4. Without expense to the State, manage, operate and maintain <br />the project system continuously in an efficient and economical <br />manner, and assume all legal liability for such management, <br />operation and maintenance. <br /> <br />5. Make the services of said project available within its <br />capacity to all persons in Contractor's service area without <br />discrimination as to race, color, religion or natural origin <br />at reasonable charges, including assessments, taxes.or fees in <br />accordance with a schedule of such charges, whether for one or <br />more classes of service, formally adopted by the Contractor <br />through its board. of directors, as may be modified from time <br />to time by contractor. The initial rate schedule must be <br />approved by the State, Thereafter, the Contractor may make <br />such modifications to the rate schedule as the Contractor <br />.deems necessary to efficiently and economically provide for <br />the financial requirements of the system as long as the rate <br />schedule remains reasonable and non-discriminatory, and subject <br />to approval by the State" <br /> <br />6. Adjust its operating costs and service charges from time <br />to time to p~ovide for adequate operation and maintenance, <br />emergency repair services, obsolescence reserves, debt service <br />and debt service reserves. <br /> <br />7. Expand the system from time to time to meet reasonable <br />growth or service requirements in the area within its juris- <br />diction. <br /> <br />8, Provide the State with such periodic reports as it may <br />require and permit periodic inspections of its operations and <br />accounts by ~ designated representative of the State, The <br />Colorado Water Conservation Board, its agents and employees, <br />is hereby designated as the agent of the State for the purposes <br />of this contract. <br /> <br />9. To purch~se from the State all of the State's right, title <br />and interest in said project and any facilities thereof at a <br />total purchase price of Two Hundred Forty-Three Thousand Six <br />Hundred Eighty Dollars ($243,680) payable in forty (40) annual <br /> <br />Page 2 of ~ pages <br />