<br />THIS CONTRACT, made this 1st day of June
<br />State of Colorlldo fur the use and benefit of the Deparlmenl of . I
<br />(Colorado Water Conservation Board) ,
<br />hereinafter rt.>ferred to as the State and"2 Farmers Extension Ditch and
<br />Lake Lateral. P. 0". Box 550. Johnstown, CO 80534,
<br />hereinafter referred 10 as the contractor,
<br />
<br />Hiqhland
<br />
<br />WHEREAS, aUlhorily exists in Ihe Law and Funds have been budgeted, appropriated and otherwise made
<br />, ",;I,blo ,Old, ,uffki,nl un""u",b",d b,'",,, .hmuf "m,in, ~~bl' fU-' p'ymon' in Fund Numb" 40 oa .
<br />G/l Accounl Numher 5318~ Contract Encumbrance Number _c:;:~ '~~nd
<br />ABL Account Number ~, Org, Unit 77- 7- 77,
<br />WHEREAS, rC1luircd approval. clearance and courdination has been accomplished from and with appropriate
<br />agencies: and
<br />
<br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado
<br />Revised Statutes, the State is authorized to construct certain
<br />water projects for ~he benefit of the people of the State; and
<br />
<br />WHEREAS, the Contractor is a mutual ditch company in the
<br />State of Colorado and wishes to undertake repairs of its
<br />irrigation system. hereinafter called the project, for the
<br />Farmers Extension Ditch and Highland Lake Lateral shareholders
<br />in Weld County, Colorado, at an estimated cost of Three
<br />Hundred Fifty-Five Thousand Dollars ($355,000); and
<br />
<br />WHEREAS, a feasibility investigation of said project was
<br />conducted and it was found that such a project is economically
<br />feasible; and
<br />
<br />WHEREAS, the State has agreed to construct said project and
<br />to sell the same to the Contractor upon mutually agreeable
<br />terms and conditions, subject to the availability of funding
<br />for that purpose; and
<br />
<br />WHEREAS, pursuant to Senate Bill No. 67, Fifty-Second
<br />General Assembly of the State of Colorado, duly enacted into
<br />law, the Colorado Water Conservation Board has been authorized
<br />to expend a sum not to exceed One Million Two Hundred Thousand
<br />Dollars ($1,200,000) for construction of the project:
<br />
<br />NOW THEREFORE, in consideration of the mutual and
<br />dependent covenants herein contained, it is agreed by the
<br />parties hereto as fOllows:
<br />
<br />A. The Contractor agrees that it shall:
<br />
<br />1. Employ an ~ngineering firm to prepare project plans
<br />and specifications for the proposed project. Both the
<br />engineering firm and the project plans and specifications shall
<br />be approved by the State.
<br />
<br />2. Subcontract the construction of said project to a
<br />responsible and cap~ble firm, said project to be completed
<br />within two (2) years of the date of this contract in accordance
<br />with the project plans and specifications and any necessary
<br />modification thereof approved by the State. The State must
<br />approve, in writing. all subcontracts before they become
<br />effective. The above-mentioned time may be extended by the
<br />State if such time is insufficient because of acts of God or
<br />other acts or circu~stances beyond the control of the
<br />Contractor.
<br />
<br />3. Require all Subcontractors to indemnify the State and
<br />the Contractor agaihst all liability and loss, and against all
<br />claims and actions based upon or arising out of damage or
<br />injury, including death, to persons or property caused by or
<br />
<br />395-5}()1-1014
<br />
<br />Pagt.>. I of -1..... oages
<br />"/s,.,.UlSlll!l'li"",oll'''v''rwof 1:L,1I'age.l
<br />
<br />200
<br />farmers
<br />
|