My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00297
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:48:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Gl 11. Equations(s) and spilhiay discharge table. <br /> <br />Gl 12. Reservoir elevation storage table to the crest of the da~. <br /> <br />B. The hydrologic da~ break analysis for spill~/ay design less than PIIF <br />should include the following: <br /> <br />n/a 1. Fl ood pl ai n map of inundated critical area showi ng pre and <br />post failure high water lines. <br /> <br />n/a 2. Cross sections to scale with elevation and channel I~idths. <br />Sholiing pre and post failure water lines including <br />discharges and average velocities. <br /> <br />a. Just below da~. <br />b. Intermediate channel sections. <br />c. Critical sections within the inudated critical area. <br /> <br />n/a 3. Hydraulic parameters assumed. <br /> <br />n/a 4. Sensitivity analysis of assumptions; i.e., time to complete <br />failure, depth of overtopping, channel roughness (Mannings <br />IInll). <br /> <br />n/a 5. Estimated probabil i ty of the fail ure of the dar.1 by <br />overtopping based on reoccurrence interval of flood. <br /> <br />n/a 6. Discussion of why the damage resulting from an overtopping <br />dam failure is insignificant. <br /> <br />n/a 7. COr.1puter printout of the dar.1 break flood. <br /> <br />n/a 8. The dar.1 break flood study shoul d cOr.1ply with the concepts <br />outlined in Design Revieli tler.1orandur.1 No.4. <br /> <br />III. HAZARD RATING DM1 BREAK CLASS I (HIGH HAZARD) <br /> <br />A. As a separate report or a report section of the hydrology report, the <br />engineer shall evaluate the hazard of the daD. <br /> <br />Criteria shall be as follol/s: <br /> <br />n/a 1. The nonhydrologic failure shall consider the reservoir full <br />at the norr.1al high water line. <br /> <br />n/a 2. Several reasonable failure rates shall be evaluated to <br />determine the sensitivity of the assur.1ed parar.1eter. <br /> <br />n/a 3. Analysis of flood inundation shall continue dO\/nstrear.1 <br />until the flood stage is equal to or less than the lOO-year <br />flood plain. <br /> <br />21 34H/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.