My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00297
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:48:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153507
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DESIGN ENGINEER CHECK LIST <br /> <br />The following copy of the Stat~ Engineer's Dffice "Design Engineer's Check <br />List" has been filled in to assist the Dar.l Safety Branch in their review of <br />the project. The check list r.Iakes reference by page number to the Final <br />Desi gn Report (FoR-_) and to the Constructi on DraHi ngs by DraNi n9 NUr:1ber <br />(2024- ). Iter:1s not applicable to the project are labeled n/a. Iter.1s <br />requirTii'g"ii check nark only are designsated by an "x". <br /> <br />1. SUBrlITTAL REQUIREt,lENTS <br /> <br />A. General list of itens to be subr.litted for prelil~inary reviell. (The <br />hydrology report l'/i 11 be accepted for revi el'l; hOl'/ever, the cOr:1pl ete <br />1 i st of i teras raust be on fil e before the lBO-day revi ew 1 imi t peri od <br />begins.) <br /> <br />FDR-24, Ap.D l. Hydrology report i ncl udi ng spi 11 way desi9n and <br /> incremental dar.lage analysi s as requi red. <br />FOR-24 2. Hazard classification report. <br />FDR-10 3. Two copies of the geotechnical report. <br />Attac hed 4. TI~o complete sets of blue/black line drawings. <br />Attached 5. T\/o complete sets of technical specifications. <br /> <br />Separate Cover 6. <br /> <br />An engineer's cost estir.late in sufficient detail to <br />evaluate the cost of construction. <br /> <br />Separate Cover 7. <br /> <br />A filing fee as required by statute. <br /> <br />FDR-Preface <br /> <br />B. Design engineer check list and project information <br />record. <br /> <br />FDn <br /> <br />9. (Optional) An engineer's design report showing all <br />calculations, references, and assumptions facilitate <br />up the revieN process. <br /> <br />B. Subsequent revi ews <br />(PRELIMINARY REVIEW) <br /> <br />of <br /> <br />corrected <br /> <br />pl ans <br /> <br />and <br /> <br />specifications. <br /> <br />n/a 1. T\~o complete sets of plans 11ith corrections based upon <br />COr.Jr.1ents from the previous reviel/. <br /> <br />n/a 2. Two cOr:1plete sets of specifications with corrections based <br />upon comments from the previous review. <br /> <br />n/a 3. A transr.littal letter explaining location and character of <br />changes in the plans and specifications which ~/ere r.Iade by <br />the engi neer and not in response to the previous revi e\1 <br />comr:1ents. <br /> <br />21 34H/l <br />
The URL can be used to link to this page
Your browser does not support the video tag.