Laserfiche WebLink
<br />, <br />Form 6-AC-02A <br /> <br />'- <br /> <br />k'i5S (tWI <br /> <br />DEPAR~ENT OR AG CY NUMBER <br />34-04-00 <br />CONTRACT ROUTING NUMBER <br />'ir <br />$59,000 <br /> <br /> <br />CONTRACT <br /> <br />1984, by and. between the <br />Natural Resources <br /> <br />THIS CONTRACT. made this 1st day of June <br />State of Colorado for the use and bellefit of the Oeeartment of '1 <br />(Colorado ,Water Conservation Bpard), <br />hereinafter referred to as the State, aIld '2 the San Miquel <br />Box %, Redvale, CO 81431, <br />hereinaft~r r~ferred to- as the contractor, <br /> <br />Water Conservancy D~str1ct, <br /> <br />WHEREAS, authority exists in the Law and Funds hal/e been budgeted. appropriated and otherwise made <br />available and a sufficient unencumben~d balance- thereof remains' 3(';!Sle fWlmeni in Fund Number 4008 . <br />G/L Account Number 5264X ,Contract Encumbrance Number <"3 and <br />ABL Account Number miQ, Org. Unit 77-77-777" ' , <br />. . -WHEREAS. rel\ulred approl/ul, clearance lmd.coordination has been accomplished from and with appropriate <br />agencies; ;md . <br /> <br />WHEREAS, pursuant to the provisions of section 37~60-119, <br />Colorado Revised Stat~tes 1973, as amended, the State .is <br />authorized to construQt certain water projects for. the benefit pf <br />the people of the State of Colorado~ and <br /> <br />WHEREAS, the San Miguel Water Conservancy District has .m?de <br />application ~o the. State for a reconnaissance study of the <br />rescoped San Miguel PI:'oject ~ and <br /> <br />WHEREAS, the Contractor is a Water Conservancy District <br />within the State of ~olorado~ <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. The Contract0r shall have a reconnaissance study <br />prepared and directed to rescope the San Miguel project in <br />accordance .with a proDosal for a project report prepared by .the <br />consulting engineerin9 firm of Weste~n Engineera, Inc., Grand <br />. Junction, Colorado (the Consultant), and approved by the State, <br />received April 23, 1984, which proposal -is attached hereto as. <br />Exhibit A and made a part of this contract. <br /> <br />2. Fifteen (lS) copies of the final study called for ,in <br />this contract shall b~ furnished to the State not later than <br />August 1, 1984, unles~ such time is extended by mutual agreement <br />of the parties hereto in wr~ting. <br /> <br />3. As compensatton for the servic~s of the C~ntractor, the <br />State shall pay to th~ Contractor the sum of Fifty-Nine Thousand <br />Dollars ($59,000) in the manner following: <br /> <br />a. Sixty per~ent (60%), to wit, Thirty~Five Thousand <br />Four Hundred Dollars' ($35,400) of the total amount due <br />in two (2) m~nthly installments of Seventeen. Thousand <br />Seven Hundreq Dollars ($17,700) each, commencing on <br />June 15, 1981. <br /> <br />b. The rematning forty percent (40%), to wit, <br />.Twenty-Three Thousand Six Hundred Dollars ($2~,600) <br />within forty. (40) days following receipt and acceptance <br />of the writt~n report specified in paragraph 2 of this. <br />contract. ' '. <br /> <br />4. The total CO~t of services to be rendered for the <br />Contractor by the Con~ultant is Sixty-Nine Thousand Dollars . <br />($69,000) and the Contractor shal~ pay the .sum of ren Thousand <br />Dollars ($10;000) as ~greed td by letter dated March 23, 1984; <br />which is hereby attached and made a part of this contract as <br />Exhibit B~ and in_no ~vent shall this payment be the liability of <br />the State. <br /> <br />395-53001-1014 <br /> <br />Page I of~paRes <br />*{Scc instructioJls (,Ill rc~cn.c or last ~age,) <br /> <br />202 ' , <br />san/miguel <br />