My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00294
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:47:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153035
Contractor Name
Carbondale, Town of
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
SB 75-468
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VII-ld <br /> <br />. <br /> <br />Tests of these ,ells indicate potential yields of 400 gpm or more. Just <br /> <br /> <br />southeast of Ba.alt, the results of an alluvial test hole indicate p')ten- <br /> <br /> <br />tial yields of 200 gpm or more. <br /> <br />At both of the above described localities, water quality was good with the <br /> <br /> <br />exception of hardness. The hardness values in both cases exceeded 204 ppm. <br /> <br />Test Well <br /> <br /> <br />During the period of June through August, 1975, Test Hole A was dri I led and <br /> <br /> <br />test pumped for the Town of Carbondale, Colorado. The test well was included <br /> <br /> <br />as a part of an EDA project and was paid for from the Town's matching funds <br /> <br /> <br />for this overall project. This test hole is located next to the Crystal <br /> <br /> <br />River in the SWi;, SEi;, Section 3, T8s, R88w, 6th P.M., on prope,-ty owned by <br /> <br /> <br />Mr. Walter Doroughty. A location map is shown on Figure VII-B. <br /> <br />. <br /> <br />Prior to tile drilling of this test hole, a hydrogeologic and geophysical <br /> <br /> <br />investigation of the Carbondale area was conducted by Wright Water Engineers, <br /> <br /> <br />Inc. This study was concluded in February, 1975. The data is included in <br /> <br /> <br />Appendix D. <br /> <br />Test Hole A was not drilled at the most suitable location indicated by the <br /> <br /> <br />geophysical work due to problems in securing an easement. Therefore, addi- <br /> <br /> <br />tional soundings were conducted in June at the site of Test Hole A. The <br /> <br /> <br />data gathered at that time is also included in Appendix E. <br /> <br />Water and geologic formation samples were collected during the drilling. <br /> <br /> <br />Short bail tests were conducted at selected intervals to monitor possible <br /> <br /> <br />flucutations in water quality and quantity. Upon completion of the test <br /> <br /> <br />hole, a 17-hour pumping test was conducted. The well was then deepened and <br /> <br /> <br />a 24-hour pumping test conducted. <br /> <br />Carbondale Test Hole A was completed to a depth of 84.5 feet on August 19 <br /> <br /> <br />1975. Two formal pumping tests were conducted. The second test, conducted <br /> <br /> <br />after the well was completed to a depth of 84.5 feet,was at a discharge rate <br /> <br /> <br />of 510 - 517 gpm. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.