Laserfiche WebLink
<br />because of acts of God' or other acts or circumstances beyond the <br />control of the Contractor. <br /> <br />2. Conveyor cause title to be conveyed by deed or other proper <br />conveyance to the Colorado Water Conservation Board, Department of <br />Natural Resources, State of Colorado, the following portions of 'the <br />proposed project facilities: <br /> <br />a. A 50,000 gallon elevated steel water storage tank located <br />on Grant Avenue, near Fifth Street. <br /> <br />b. A 6-inch diameter 2,210 foot line on Fourth Street between <br />Roosevelt and Washington Avenues with all appurtenances. <br /> <br />c. A 6-inch diameter 860 foot line on Washington Avenue <br />be,tween Second and Fourth Street with all appurtenances. <br /> <br />d. A 6-inch diameter 1,120 foot line on Grant Avenue between <br />Fourth and Seventh Street with all appurtenances. <br /> <br />3. Permit periodic inspection of construction by the authorized <br />representatives of the State during construction and permit the State <br />to review and approve or disapprove any contracts for the construction <br />of the project or the performance of work pursuant to such contracts <br />or subcontracts. <br /> <br />4. Without expense to the State, manage, operate, and maintain <br />the project system continuously in an efficient and economical manner, <br />and assume all legal liability for such management) operation, and <br />maintenance. <br /> <br />5. Make the services of said project available within its capacity <br />to all persons in the Contractor's service area without discrimination <br />as to race, color, religion, or natural origin at reasonable charges, <br />including assessments, taxes, or fees in accordance with a schedule <br />of such charges, whether for one or more classes of service, formally <br />adopted by the Contractor through its board of directors, as may be <br />modified from time to time by the Contractor. The initial rate <br />schedule must be approved by the State. Thereafter, the Contractor <br />may make such modifications to the rate schedule as the Contractor <br />deems necessary to efficiently and economically provide for the finan- <br />cial requirements of the system as long as the rate schedule remains <br />reasonable and non-discriminatory, and subject to the approval by the <br />State. <br /> <br />6. Adjust its operating costs aud service charges from time to <br />time to provide for adequate operation and maintenance, emergency <br />repair services,~obsoleseerrce reserves, debt service, and debt <br />reserves. <br /> <br />7. Expand the system from time to time to meet reasonable growth <br />or service requirements in the area within its jurisdiction. <br /> <br />8. Provide the State with such periodic reports as it may require <br />and permit periodic inspections of its operations and accounts by a <br />designated representative of the State. The Colorado Water Conservation <br />Board, its agents, and employees, is hereby designated as the agent <br />of the State for the purposes of this contract. <br /> <br />Page I of ~ pages <br />