My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00288
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:47:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153825
Contractor Name
Farmers Pawnee Canal Company, The
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />2. <br /> <br />I <br /> <br />written approval from the Board of Directors: <br />1. A change in point of diversion from the Pawnee Canal Headgate <br /> <br />I <br /> <br />to any other point of diversion; <br /> <br />2. A change in type of use from irrigation to any other use; and/or <br /> <br />I <br /> <br />3. A change in place of use to irrigate lands not historically <br />irrigated by the Farmerl Pawnee canal. <br /> <br />I <br /> <br />A shareholder desiri~g to make any of the above changes shall submit <br /> <br />a written request to the Board of Directors. The request shall include <br /> <br />I <br /> <br />suggested te~s amd conditipns intended to prevent injury to the canal, <br /> <br />the Company, and other shareholders. The Board of Directors may, in its <br /> <br />I <br /> <br />sole discretion, ret~in legal and/or engineering consultants to assist <br /> <br />I <br /> <br />the Board in evaluating the request. The shareholder(s) making the <br /> <br /> <br />request shall reimburse the Board of Directors for all costs incurred <br /> <br /> <br />by the Board in considering the request, including the fees of the legal <br /> <br />I <br /> <br />and/or engineering consultants retained by the Board. Reimbursement of <br /> <br /> <br />such costs shall be due and payable to the Board of Directors within <br /> <br />thirty (30) days after receipt of an itemized statement of such costs <br /> <br />I <br /> <br />from the Board. If, in the opinion of a majority of the Board of <br /> <br />directors, such change may be made without injury to the canal, the <br /> <br />I <br /> <br />the Company, and other shareholders, such water may then be delivered <br /> <br />to such place or places for the type of use requested; provided that <br /> <br />I <br /> <br />the shareholder requesting the change shall notify, in writing, all <br /> <br /> <br />shareholders who are entitled to delivery of water at either the place <br /> <br />I <br /> <br />from which or to which delivery is changed of such change; and provided <br /> <br />further that judicial approval of the requested change has also been <br /> <br />I <br /> <br />obtained pursuant to the applicable provisions of C.R.S <br /> <br />37-92-101, <br /> <br />I <br /> <br />at seg. as they may from time to time be amended. Board of Director <br />a~proval shall not be required for changes in places of delivery from <br /> <br />one farm turnout to aPother along the Farmers' Pawnee Canal for <br />irrigation of land historically irrigated by the canal. <br /> <br />I <br /> <br />I, <br />l- <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.