Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />10 - CONCLUSIONS AND RECOMMENDATIONS <br /> <br />I <br /> <br />10.1 CONCLUSIONS <br /> <br />I <br /> <br />10.1.1 The need for the project is established based on the condition <br />of the existing system, the quality and quantity of existing supplies <br />and the projected population growth. <br /> <br />I <br /> <br />10.1.2 Although water rates will be high in relation to normal and less <br />extensive treatment systems, the project is financially feasible <br />if adequate grant and low interest loan funds can be acquired. <br /> <br />I <br /> <br />10.1.3 Because of escalating construction costs due to inflation, the <br />St?ge. I project should be completed as soon as possible. <br /> <br />I <br /> <br />10.2 RECOMMENDATIONS <br /> <br />I <br /> <br />It is recommended-;that the Board of Trustees of the Town of Swink take the follow- <br />ing steps to proceed with the project: <br /> <br />I <br /> <br />10.2.1 By resolution, adopt this report as written (or amended) and express <br />a determination to proceed with the project. <br /> <br />I <br /> <br />10.2.2 Set up a preapplication conference with representatives of the <br />Colorado Water Conservation Board and the Farmers Home Administra- <br />tion to formalize applications to each agency. <br /> <br />I <br /> <br />10.2.3 Prepare and submit an application for 100% financing of Project I <br />of the Stage I construction to the Economic Development Administra- <br />tion. <br /> <br />I <br /> <br />10.2.4 'Prepare and submit the applications for other grant and loan funds. <br /> <br />I <br /> <br />10.2.5 If determined necessary by the preapp1ication conferences, begin <br />arrangements for commercial financing. <br /> <br />I <br /> <br />10.2.6 Adopt and implement the appropriate water-~ate structure as deter- <br />mined by results of preapplication conferences. Adoption of the <br />new rate structure should be effective no later than January 1,1977. <br /> <br />I <br /> <br />10.2.7 Enter into a contract for engineering services for preparation <br />of construction plans and specifications for the Stage I project. <br /> <br />I <br /> <br />10.2.8 Purchase or acquire options to purchase the sites and easements <br />required for the Stage I construction. <br /> <br />I <br /> <br />I <br /> <br />-53- <br /> <br />I <br />