My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00283
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:47:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0009X
Contractor Name
Swink, Town of
Contract Type
Loan
Water District
0
County
Otero
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6.2.3. Storage Facilities <br /> <br />No. <br /> <br />Item Description <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />100,000 Gallon Elevated Storage <br />Tank L.S. $138,000.00 <br /> <br />Tank Foundation & Site Development L.S. 5,300.00 <br /> <br />Subtotal - Storage Facilities <br /> <br />1. <br /> <br />2. <br /> <br />6.2.4 Water Treatment Facilities and Well Houses <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />Well House & Equipment (Well #3) <br /> <br />Well House & Equipment (Well #4) <br /> <br />Well House & Equipment (Well #2) <br /> <br />Modifications to Existing Well House <br />No. 1 and Treatment Plant <br /> <br />Modifications to Exist. Cistern <br /> <br />Reverse Osmosis Equipment <br /> <br />R. O. Pretreatment Equipment <br /> <br />R. O. Post Treatment Equipment <br /> <br />Treatment Plant Building <br />.. <br />Internal & External Piping & H.S. <br />Pump <br /> <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br /> <br />6.2.5 Deduct Alternates <br /> <br />6.2.5.1 Deduct Alternate No.1 <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />8" D.I. Pipe <br />8" A.C. Pipe <br />8" Valve & Box <br />Hwy & Railroad Crossing <br /> <br />L.S. <br /> <br />LoS. <br /> <br />L.S. <br /> <br />$ <br /> <br />4,500.00 <br />4,000.00 <br />1,000.00 <br /> <br />L.S. <br /> <br />L.S. <br /> <br />L.S. <br /> <br />L.S. <br /> <br />L.S. <br /> <br />L.S. <br /> <br />15,000.00 <br /> <br />3,00.0.00 <br /> <br />60,000.00 <br /> <br />21,500.00 <br /> <br />11,000.00 <br /> <br />40,000.00 <br /> <br />L.S. 20,000.00 <br />Subtotal-Treatment Facilities <br /> <br />274 Ft. <br /> <br />446 Ft. <br /> <br />2 Ea. <br /> <br />210 Ft. <br /> <br />$ <br /> <br />9.60 <br />6.40 <br />415.00 <br />65.00 <br /> <br />Subtotal-Deduct Alternate No. 1 <br /> <br />1. <br /> <br />6.2.5.2 Deduct Alternate No.2 <br />8" D. 1. Pipe <br />8" A.C. Pipe <br />8" Valve & Box <br />Hwy & Railroad Crossing <br /> <br />2. <br /> <br />3. <br />4. <br /> <br />36 Ft. <br />264 Ft. <br />1 Ea. <br />30 Ft. <br /> <br />$ <br /> <br />9.60 <br />6.40 <br />415.00 <br />65.00 <br /> <br />Subtotal-Deduct Alternate No. 2 <br /> <br />-36- <br /> <br />Total Cost <br /> <br />$138,000.00 <br /> <br />5,300.00 <br /> <br />$143,300.00 <br /> <br />$ 4,500.00 <br />4,000.00 <br />1,000.00 <br /> <br />15,000.00 <br />3,000.00 <br />60,000.00 <br />21,500.00 <br />11,000.00 <br />40,000.00 <br /> <br />20,000.00 <br />,$180,000.00 <br /> <br />$ 2,630.40 <br /> <br />2,854.40 <br />830.00 <br /> <br />13,650.00 <br /> <br />$ 19,964.80 <br /> <br />$ 345.60 <br /> <br />1,689.60 <br />415.00 <br /> <br />1,950.00 <br />$ 4,400.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.