My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00279
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:39:04 PM
Creation date
10/5/2006 11:47:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153572
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The North Poudre Irrigation Company <br /> <br />p, O. Box 100 Phone 568-3612 and 568.3966 <br />Wellington. Colorado 80549 <br /> <br />May 24, 1989 <br /> <br />Mr. Nick C. Ioannides. P.E. <br />Colorado Water Conservation Board <br />721 state Centennial Building <br />1313 Sherman Street <br />Denver. Colorado 80203 <br /> <br />RE: Feasibility Study for the Rehabilitation of North poudre <br />Reservoir No.2. <br /> <br />Dear Mr. Ioannides: <br /> <br />The North poudre Irrigation Company is herewith transmitting the <br />feasibility study for the rehabilitation of North Poudre Reservoir <br />No.2. This study and report was jointly funded by the Colorado <br />Water Conservation Board and The North Poudre Irrigation Company. <br />The feasibility was done as a part of North Poudre's application to <br />the Colorado Water Conservation Board to obtain financing for one- <br />half (~) the construction cost for the rehabilitation of Reservoir <br />No.2. <br /> <br />The attached report has been prepared in accordance with the <br />Colorado Water Conservation Board requirements governing the <br />content and format of feasibility reports. All required documents <br />have been included in the report which consists of eight (8) <br />chapters and Appendices A through H. <br /> <br />With the submittal of this report. The North poudre Irrigation <br />Company formally requests funding from the Colorado Water Conserva- <br />tion Board Construction Fund to finance one-half (~) of the project <br />cost for the rehabilitation of Reservoir No.2. The total project <br />cost for the alternative chosen by The North Poudre Board of <br />Directors is approximately $622,000. Your consideration and <br />approval of this funding will be greatly appreciated. <br /> <br />-ii':.,erelY, 1~ <br /> <br />Manuel 1neda. President <br />The North Poudre Irrigation Co. <br /> <br />MP/ls <br />
The URL can be used to link to this page
Your browser does not support the video tag.