Laserfiche WebLink
<br />I <br />I <br />:1 <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />FEASIBILITY STUDY <br />Stone Canyon Reservoir <br /> <br />INTRODUCTION <br /> <br />The Town of Lyons is located in Boulder County, Colorado. It was incorporated in 1891 and has a current <br />population of approximately 1,700 people. The Town of Lyons Comprehensive Plan (BR W, 1998) projects <br />a fmal build out population of approximately 3,000 people in the Town and surrounding areas. Wright <br />Water Engineers, Inc. recently completed the Town of Lyons Long Range Water System Plan to assess and <br />plan for the Town's future water needs. This plan identifies a need for a new water storage reservoir to <br />store Colorado Big Thompson (C-BT) water in order to meet the Town's water demands. <br /> <br />The Town of Lyons has identified a potential storage reservoir location in Stone Canyon just east of the <br />Town. The purpose of this study is to determine the feasibility of construction of a new storage reservoir <br />at the Stone Canyon site. <br /> <br />PROJECT LOCATION <br /> <br />The proposed dam and reservoir site is located in Stone Canyon which is approximately one mile east of <br />Lyons and can be accessed by way of State Highway 66 and Nolan Road. The exact location is Section <br />17, Township'3 North, Range 70 West of the 6th Prime Meridian. Figure 1 included herein shows the <br />project location. <br /> <br />PROJECT SPONSOR <br /> <br />This feasibility study is sponsored by the Town of Lyons and the Colorado Water Conservation Board <br />(CWCB). The Town currently has a population of approximately 1,700 people which is expected to grow <br />to a population of 2,635 by the year 2020 with a maximum population of 3,000 based on the Town of <br />Lyons Comprehensive Plan, The Town's total revenues for the year 2000 were $888,222; total <br />expenditures were $732,581; with a remaining balance of $455 ,248. For the year 2002 the projected total <br />revenues are $843,688; total expenditures of $896,029; with a remaining balance of $317,038. <br /> <br />The Town's Articles of Incorporation are included in Appendix A and the Town's financial statements and <br />budget projections are provided in Appendix B. <br /> <br />Stone Canyon Dam Feasibility <br /> <br />Page 1 <br />