My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00268
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2011 9:19:23 AM
Creation date
10/5/2006 11:46:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153671
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
FSA
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />WOOdward..clylt <br /> <br />.} <br /> <br />Mr. Garrett Jackson, P.E., a Senior Staff Engineer with Woodward-Clyde Consultants, <br />has over 12 years of construction experience and over 6 years of engineering experience <br />including design, layout, and construction of highways, pipelines, earth dams, landfills, <br />and storage tanks, He has performed site investigations, and engineering aniUyses, <br />construction management and observation, and project management for dam and <br />structure foundations, earthwork construction, and underground storage tanks. <br /> <br />Mr. Pete Stauffer. Mr. Stauffer received his master's degree from the University of <br />Texas in geotechnical engineering in 1984, and has 12 years of experience with <br />landslides, slope stabilization, preparation of plans and specifications, and construction <br />engineering. Mr. Stauffer was the project engineer for investigation of the Telluride <br />Airport landslide and the Forest City landslide, <br /> <br />We have also included the resumes of additional staff that may be used on subsequent <br />phases of the work including Messrs, John Andrew and Scott Randall for hydrology, and <br />Mr. Ai Meyer for cost estimating. <br /> <br />Other members of WCCs Denver office staff will be assigned to the project as necessary <br />to meet technical and schedule requirements, <br /> <br />3.3 CLIENT REFERENCES <br /> <br />We would encourage you to contact any of the persons listed below for an evaluation <br />of our qualifications, capabilities and past performance, <br /> <br />Woodward~Clyde Consultants <br /> <br />23360/PRO.3 12-08-93(8:53ll1D)/RPT <br /> <br />3-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.