Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />.,_ ".\,.)l <br />":\ <br /> <br />HARRIS WATER ENGINEERING, INC. <br />954 Second Avenue <br />Durango, Colorado 81301 <br />(303) 259-5322 <br /> <br />September 29, <br /> <br /> <br />~--:- /~,",..-~.JI' <br />""..' :rji <br />l~;;;Z -;-~'~-:::~::-l' I <br /> <br />, ~ <br />I <br />L: <br /> <br />.f:. ~:..;- ,1 j <br /> <br />J <br /> <br />Steven C. Harris, P,E, <br /> <br />John Van Sciver <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721. <br />Denver, Colorado 80203 ' <br /> <br />Dear John: <br /> <br />This letter is to' confirm our :teview of the reservoir sites I <br />identified, which concluded Task 1 of the contract between my firm <br />and the CWCB. I have also enclo~ed an invoice for Ta~k 1. <br />, ' <br /> <br />The attached table lists the dam~ that I identified during Task 1 <br />and designates which dams will be studied in greater detail for the <br />remaining task,s. Also attachecl is a summary of the entities <br />contacted to identify the reserv0ir sites. <br /> <br />The detailed studies will include 24 sites sponsored by 19 <br />entities. The data available for the sites ranges from nearly <br />nothing to majed' previous studies, and everything in between. <br />- ~ <br /> <br />Generally, I will be visiting the sites in October (Task 2) and <br />performing technical evaluations in November and early December <br />(Task 3). <br /> <br />Please call if you have any questions or comments. <br />touch as the study progresses. <br /> <br />I . 11 be in <br /> <br />j~lY, CI7f~ <br /> <br />Steven C Harris <br /> <br />enclosures <br />