Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />December, 1985 <br /> <br />City of Broomfield <br />No. 6 Garden Center <br />Broomfield, CO 80020 <br /> <br />Gentl emen: <br /> <br />We are pleased to submit to the City of Broomfield the report IIGreat <br />Western Dam and Spillway Enlargement-Amended Feasibility Studyll dated <br />December, 1985. <br /> <br />A draft copy of the report was prepared by Hydro-Triad, Ltd. in <br />October 1984; that report was not finalized or issued for public <br />distribution. Subsequently, the City of Broomfield selected Rocky <br />Mountain Consultants (RMC) to finalize the October 1984 draft for <br />issue to the CWCB. <br /> <br />In preparing the Amended Feasibility Study, RMC has drawn heavily on <br />the Hydro-Triad, Ltd. draft report. Unless otherwise noted as being <br />revised by RMC, the Figures, Tables and text were the original work of <br />Hydro-Triad, Ltd. as consultants employed by the City. Nevertheless, <br />except for Chapter III, RMC is responsible for the contents, conclu- <br />sions and recommendations of the Feasibil ity Study. Leonard Rice <br />Consulting Water Engineers produced Chapter III and is responsible for <br />its contents. <br /> <br />Thank you for selecting RMC to prepare the Amended Feasibility Study. <br />We will be happy to answer any questions or provide additional infor- <br />mation upon request from the City or the CWCB. <br /> <br />Sincerely, <br /> <br />ROCKY MOUNTAIN CONSULTANTS, INC. <br /> <br />L. Stephen Schmidt, P.E. <br />Project Manager <br /> <br /> <br />LSS: 1 es <br />Enclosure <br />