Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LIST OF TABLES <br /> <br />Table II - 1 Broomfield Population <br /> <br />Tab 1 e II 1- 1 <br />Table III- 2 <br />Tab 1 e I II - 3 <br />Tab 1 e I II - 4 <br />Table III- 5 <br />Tab 1 e I II - 6 <br />Table III- 7 <br />Table 111- 8 <br />Tab 1 e II 1- 9 <br /> <br />Table III-I0 <br /> <br />Tab 1 e I II -11 <br /> <br />Tab 1 e II 1-12 <br /> <br />Table III-13 <br /> <br />Tab 1 e II I -14 <br /> <br />Tab 1 e II 1-15 <br /> <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br />Table <br /> <br />IV - <br />IV - <br />IV - <br />IV - <br />IV - <br />IV - <br />IV - <br /> <br />Table IV - 8 <br />Table IV - 9 <br />Table IV -10 <br /> <br />Historic Water ~roduction Data <br />Estimated Usage of Treated Water by Category <br />Projected Water Demands <br />Church Ditch Decrees <br />Great Western Reservoir Decrees <br />Community Ditch Decrees <br />Water Supply by Source <br />Great Western Reservoir Modeled Demand <br />Great Western Reservoir Operation Study, December, 1985, <br />S=12000, Current Sources Only, Demand = 4800 <br />Great Western Reservoir Operation Study, December, 1985 <br />S=12000, 3500 Inches, No Windy Gap, Demand = 6175 <br />Great Western Reservoir Operation Study, December, 1985 <br />S=12000, Current Sources Only <br />Great Western Reservoir Operation Study, December, 1985 <br />S=12000, Current Sources Plus 6000 Acre-Feet Windy Gap <br />Great Western Reservoir Operation Study, December, 1985 <br />S=12000, 3500 Inches, No Windy Gap <br />Great Western Reservoir Operation Study, December, 1985 <br />$=12000, 3500 Inches Plus 4000 Acre-Feet Windy Gap <br />Broomfield Water Quality - September, 1981 through September, 1982 <br /> <br />1 Area Capacity Table - Great Western Reservoir <br />2 References for "As-Builtl' Data, Existing Piping Arranagment <br />3 Gate Structure Slide Gates <br />4 Existing Land Ownership Summary <br />5 Recommended Land Acquisition <br />6 Minimum Factors of Safety for Earth and Rockfill Dams <br />7 Preliminary Hydraulic Design Criteria, Outlet Works and Raw Water <br />Delivery System <br />Selected Precipitation Data <br />Selected Inflow Hydrograph Data <br />Reservoir Routings of Spillway Design Floods <br /> <br />Table V-I Construction Cost Estimate <br />Table V - 2 Annual Operation and Maintenance Costs <br />Table V - 3 Project Cost Stream <br /> <br />Table VI - 1 Revenue Stream <br /> <br />Table VII- 1 Proposed Financing Stream <br /> <br /> <br />i i i <br /> <br />Rev-RMC <br />