My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153976 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153976 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 11:01:26 AM
Creation date
10/5/2006 11:46:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153976
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Page 6 <br /> <br />. Memo describing methods and assumptions used in creating the files; the memo <br />is expected to be 3 to 5 pages in length <br /> <br />Task 8 - Continue State mod model assembly and calibration <br /> <br />If budget remains after Tasks 7 and 8 have been completed, Boyle will continue the <br />process of assembling input files for the new Yampa River model, and begin calibration. <br />Boyle and the State will determine jointly which tasks should be pursued. They may be <br />a subset of the following list: <br /> <br />. collect physical and operational data for High Savery Reservoir, and historical <br />content data if the reservoir began filling during the study period;1 produce new <br />'.res and '.rer files with the new information. <br /> <br />. Produce '.tar and *.eom files that include High Savery Reservoir. <br /> <br />. Review evaporation data from Wyoming to determine whether a station should <br />be added to the '.eva file to represent evaporation at High Savery Reservoir; <br />produce new '.eva file if appropriate. <br /> <br />. Review approximately fifteen instream flow filings in the headwaters of the Little <br />Snake River to determine whether they need to be included in the model. If <br />needed, generate new '.its, 'ifr, and '.ita files. <br /> <br />. Collect interstate priority list and develop appropriate priority numbers for <br />Wyoming structures consistent with Colorado's Holt numbers. Construction of the <br />number must consider CDSS data-filling techniques. <br /> <br />. Determine priority numbers for aggregated Wyoming structures. <br /> <br />. Develop return flow locations for all new structures included in the model, and <br />create a new '.rtn file. <br /> <br />. Add operating rules for High Savery Dam to the operating criteria file. <br /> <br />. assemble .stm files as required to build historical diversion and demand files for <br />irrigation structures; the process may involve combining information from multiple <br />structures to create demands for aggregated structures <br /> <br />. compare Cheyenne data in current Yampa basin model to data in the Green <br />River basin plan and resolve discrepancies if possible <br /> <br />. Generate diversion station ('.dds), diversion right (.ddr), historical <br />diversion('.ddh}, and demand ('.ddm) files. <br /> <br />. Generate control and response files. <br /> <br />Exhibits_new <br /> <br />3/5/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.