My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00262
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:13:26 AM
Creation date
10/5/2006 11:46:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153769
Contractor Name
Agricultural Ditch & Reservoir Co.
Contract Type
Loan
Water District
0
County
Jefferson
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />share of the cost of the project by vote of the Board of Directors. <br /> <br />Institutional Considerations <br /> <br />The Ditch Company has applied to the CWCB to borrow $300,000 from the Construction Fund Loan <br />Account. The loan from the CWCB is contingent upon CWCB approval, and the successful negotiation of <br />a contract between the CWCB and the Ditch Company, <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A letter was received from the Welch Ditch Users Association (WDUA) on November 23, 1996 which <br /> <br /> <br />expressed concerns regarding the ability ofthe Welch Ditch system to deliver all of the water contracted to <br /> <br /> <br />the independent small users along the ditch under the proposed project. The Agricultural Ditch Company <br /> <br /> <br />has assured the WDUA that there will be no injury to users under the Welch Ditch system as a result of the <br /> <br /> <br />proposed project. The project will restore the ability of the Welch Ditch to deliver its full decreed amount. <( <br /> <br /> <br />Based on this assurance, the WDUA verbally expressed their support of the project at the November CWCB <br /> <br /> <br />Board meeting. The WDUA also expressed a desire to participate in the final design of the project. With <br /> <br /> <br />respect to this request, the Agricultural Ditch Company has agreed to keep the WDUA informed of the <br /> <br /> <br />progress and development of the project, and will allow the WDUA to review and comment on the final <br /> <br /> <br />design ofthe project <br /> <br />A letter was also received from the Jefferson County School District R-I dated November 22, 1996 which <br /> <br /> <br />expressed concerns regarding the ability of the proposed project to continue to supply water through the <br /> <br /> <br />upper section of the Welch Ditch to the Golden High School. The Agricultural Ditch company has assured <br /> <br /> <br />the Jefferson County School District that water will continue to be diverted at the Welch Ditch Clear Creek <br /> <br /> <br />head gate for delivery to the Golden High School before it is dropped into the Agricultural Ditch for delivery <br /> <br /> <br />. to the remaining Welch Ditch users downstream, <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible, There are no significant obstacles which <br /> <br /> <br />wouldkeep the Ditch Company from successfully completing this project. <br /> <br />- 14- <br /> <br />~ I Bishop.Brogden AsSOCiates. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.