Laserfiche WebLink
<br />. <br /> <br />. <br /> <br /> step Two of Phase I study <br /> Budget Summary <br /> LRCWE MACDOUGALL Total <br />Task II-1 Review Phase I $ 7,000 $ 8,000 $ 15,000 <br />Task II-2 Closed Basin Project $ 10,000 $ 1,000 $ 11,000 <br />Task II-3 Rio Grande Compact $ 8,000 $ 5,000 $ 13,000 <br />Task II-4 Conejos Exchange $ 5,000 $ 500 $ 5,500 <br />Task II-5 Mainstem Demand $ 4,000 $ 500 $ 4,500 <br />Task II-6 Prepare/Operate Model $ 8,500 $ 1,000 $ 9,500 <br />Task II-7 Final Report Preparation $ 7,500 $ 7,000 $ 14,500 <br /> Totals $ 50,000 $ 23,000 $ 73,000 <br />Technical Approach <br /> <br />step Two of the study will consist of the following seven tasks. <br />The Task identifiers have been prefaced with. "II" to <br />differentiate them from Step One tasks. <br /> <br />Review of phase I Study Assumptions. <br />Formulation of Closed Basin Pro'j ect Modeling <br />Scenarios. <br />Refinement of study Assumptions on Rio Grande <br />Compact Operation. <br />Reconnaissance Investigation of Exchange Potential <br />from Rio Grande Mainstem to Cone'jos River Basino <br />Investigation of Rio Grande Mainstem Diversion <br />Demand Assumptions. <br />Modification and operation of Simulation Model. <br />Preparation of Rio Grande Water Supply Study Final <br />Report. <br /> <br />The task descriptions follow <br /> <br />II-1 <br />II-2 <br /> <br />II-3 <br /> <br />11-4 <br /> <br />II-5 <br /> <br />II-6 <br />II-7 <br /> <br />June 17, 1988 <br /> <br />4 <br /> <br />~ Leonard Rice Consulting Water Engineers,lnc <br />