My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00260
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br />, . <br />,. . <br />> <br />I ~ <br />I <br /> <br />j <br />. I <br />, <br /> <br />Task No.7 <br /> <br />- <br /> <br />. <br /> <br />---------------------------------------------------------------- <br /> <br />PREPARATION OF FINAL REPORT <br /> <br />Purpose: To present the study process and study results in <br />a form suitable for decision-making. <br /> <br />ApproaCh: <br /> <br />1. <br /> <br />Prepare a draft final report primarily based on the <br />task memoranda prepared in prev ious segments of the <br />study. It is important to incorporate the adv ice and <br />expertise of the CWCB, SLVWCD, USBR and a water attorney <br />into the report. The draft will be available for <br />review by the study sponsorso <br />Prepare visual aids for presentation of the study <br />results to the CWCB and SLVWCDo <br />Provide ten copies of the draft report to CWCB, SLVWCD <br />and USBR for comments and critiques. Twenty five <br />copies of the final report will be prepared. <br />Prepare twenty five copies of an executive summary of <br />the final report. <br />Prepare the study products (i.e. models, data) for <br />transmission to study sponsors for use in future studieso <br />Present the final results of the study to the CWCB, <br />SLVWCD, and USBRo <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />50 <br />6. <br /> <br />Work Product: A final report (and associated executive <br />summary) presenting the study process and study results in a <br />form suitable for decision-making. Drafts of the report will <br />be provided to the CWCB; SLVWCD and USBR for reviewo <br /> <br />C\) <br /> <br />20 <br /> <br />Leonard Rice Consulting Waler Engineers,lnc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.