My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00259
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153424
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />LIST OF TABLES <br /> <br />I <br /> <br />I <br /> <br />1-1 Summary of Planning Scenarios <br />1-2 Cost Summary Table <br />1-3 Summary of Optimum Project Configurations <br />1-4 Financial Analysis, Summary of Annual Costs <br /> <br />I <br />II <br />I. <br /> <br />IV-l Unit Prices Used For Cost Estimating <br />IV-2 Summary of Storage Costs <br />IV-3 Summary of Reservoir Land Costs <br /> <br />I <br /> <br />V-I Colorado River Basin-Water Supply Scenarios <br />V-2 Scenario I-Flow in the Colorado River Below Cameo <br />V-3 Scenario II-Flow in the Colorado River Below Cameo <br />V*4 Scenario III-Flow in the Colorado River Below Cameo <br />V-5 Summary of Cameo Calls, Scenarios I, II and III <br />V-6 Project Area Model, Water Use Assumptions <br />V-7 Project Area Crop Consumptive Use <br />V-8 Operation Study Results-Scenario A <br />V-9 Operation Study Results-Scenario B <br />V-IO Summary of Operation Study Results, East Divide Creek Reservoir <br />V-II Summary of Operation Study Results, Upper Beaver Creek Reservoir <br />V-12 Summary of Operation Study Results, Lower Beaver Creek Reservoir <br />V-13 Summary of Operation Study Results, Owens Creek Reservoir - 500 <br />acre Irrigation Demand <br />V-14 Summary of Operation Study Results, Owens Creek Reservoir - 1000 <br />acre Irrigation Demand <br />V-IS Summary of Operation Study Results, Owens Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-16 Summary of Operation Study Results, Yank Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-17 Summary of Operation Study Results, Yank Creek Reservoir - 3000 <br />acre Irrigation Demand <br />V-18 Summary of Operation Study Results, Yank Creek Reservoir - 5000 <br />acre Irrigation Demand <br />V-19 Operation Study Results.Scenario D <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />VIOl Cost Comparison Summary * Scenario A <br />VI-2 Cost Comparison Summary - Scenario B <br />VI-3 Cost Comparison Summary - Scenario D <br /> <br />LOT-l <br /> <br />I <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.