Laserfiche WebLink
<br />I <br />I <br /> <br />LIST OF TABLES <br /> <br />I <br /> <br />I <br /> <br />1-1 Summary of Planning Scenarios <br />1-2 Cost Summary Table <br />1-3 Summary of Optimum Project Configurations <br />1-4 Financial Analysis, Summary of Annual Costs <br /> <br />I <br />II <br />I. <br /> <br />IV-l Unit Prices Used For Cost Estimating <br />IV-2 Summary of Storage Costs <br />IV-3 Summary of Reservoir Land Costs <br /> <br />I <br /> <br />V-I Colorado River Basin-Water Supply Scenarios <br />V-2 Scenario I-Flow in the Colorado River Below Cameo <br />V-3 Scenario II-Flow in the Colorado River Below Cameo <br />V*4 Scenario III-Flow in the Colorado River Below Cameo <br />V-5 Summary of Cameo Calls, Scenarios I, II and III <br />V-6 Project Area Model, Water Use Assumptions <br />V-7 Project Area Crop Consumptive Use <br />V-8 Operation Study Results-Scenario A <br />V-9 Operation Study Results-Scenario B <br />V-IO Summary of Operation Study Results, East Divide Creek Reservoir <br />V-II Summary of Operation Study Results, Upper Beaver Creek Reservoir <br />V-12 Summary of Operation Study Results, Lower Beaver Creek Reservoir <br />V-13 Summary of Operation Study Results, Owens Creek Reservoir - 500 <br />acre Irrigation Demand <br />V-14 Summary of Operation Study Results, Owens Creek Reservoir - 1000 <br />acre Irrigation Demand <br />V-IS Summary of Operation Study Results, Owens Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-16 Summary of Operation Study Results, Yank Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-17 Summary of Operation Study Results, Yank Creek Reservoir - 3000 <br />acre Irrigation Demand <br />V-18 Summary of Operation Study Results, Yank Creek Reservoir - 5000 <br />acre Irrigation Demand <br />V-19 Operation Study Results.Scenario D <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />VIOl Cost Comparison Summary * Scenario A <br />VI-2 Cost Comparison Summary - Scenario B <br />VI-3 Cost Comparison Summary - Scenario D <br /> <br />LOT-l <br /> <br />I <br />I <br /> <br />I <br />