My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00259
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153424
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />PLANNING <br />ASSUMPTIONS <br /> <br />MAXI MUM <br />WATER COST <br />$/ac-ft <br /> <br />EQUIVALENT MAXIMUM <br />CAPITAL COST <br />$/ac-ft <br /> <br />I <br /> <br />Scenario A <br />Scenario B <br />Scenario C <br />Scenario D <br /> <br />130 <br />175 <br />200 <br />Unlimited <br /> <br />1240 <br />1670 <br />1908 <br />Unlimited <br /> <br />I <br /> <br />I <br /> <br />The project selected for use as optimum project configurations are <br />presented in Table 1-3. Two alternative projects were <br />selected within each of the scenarios in order to allow a greater <br />range of opportunity for comparison and selection. <br /> <br />I <br /> <br />H. Evaluation of Alternatives <br /> <br />I <br /> <br />A financial analysis was prepared for the eight selected project <br />configurations. Two different financing scenarios were assumed. For <br />Scenario I half of the project capital costs would be funded by a <br />Colorado Water Conservation Board (CWCB) project loan at 5% interest <br />for 40 years and the remainder of the capital costs would be funded <br />through the issuance of bonds by the West Divide Water Conservation <br />District (WOWCD). A three year construction period was assumed for <br />all projects with 20% of the capital costs occurring in year I, 50% in <br />year 2, and 30% in year 3. An 8% interest rate was used for both <br />construction loans and bonds. There would be no interest during <br />construction for the CWCB loan portion of the costs. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />In financing Scenario 2, all of the capital costs would be funded <br />by a 5% loan for 40 years from the CWCB. There would be no interest <br />during the construction phase of the project. Annual operation and <br />maintenance (O&M) costs were calculated as 0.5% of total capital <br />costs in all cases. <br /> <br />I <br /> <br />The results of the financial analysis are presented in Table 1-4 <br />as annual costs by project configuration for both funding scenarios. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I-IS <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.