Laserfiche WebLink
<br /> <br />c; <br /> <br />CHAPrER V <br /> <br />PUMPING PLAN <br /> <br />f:a:. <br /> <br /> <br />One of the new residential developments under construction in <br />Basalt Project area. <br /> <br />Annual equivalent costs <br /> <br />Annual equivalent costs determined for comparison with the benefits <br />are estimated at $1,289,300 as shown below. <br /> <br />Total cost <br /> <br />Average <br />annual <br />cost <br /> <br />c <br /> <br />Project investment <br />Construction costs <br />Interest during construction <br />Less costs of investigations <br />Total <br />Operation maintenance, and r:e- <br />placement costs <br />Assigned costs of Ruedi Reser- <br />voir storage <br />Share of Colorado River Storage <br />Project costs <br />Total <br />JJ Based on average annual use of 1l,900 <br />reservoir storage water with cost of $6.50 for <br /> <br />$15,840,000 <br />l,340,000 <br />-683,000 <br />16,497,000 <br /> <br />$911,600 <br />288,200 <br />Y77,300 <br /> <br />l2,200 <br />1,289,300 <br />acre-feet of <br />each acre-foot. <br /> <br />49 <br />