Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TASK NO. 7 - DEVELOPMENT AND EVALUATION OF ALTERNATIVES <br /> <br />RATIONALE: <br /> <br />In Phase 1 of the study, <br />will be selected in a <br />follows: <br /> <br />the final proj ect configuration <br />3-stage elimination process as <br /> <br />1. In the first stage, a number of preliminary <br />project systems (12 to 15) will be configured <br />using suitable elements identified in Task 6. <br />By means of a screening process developed in <br />-~---- --.. _. - - --~..... <br /> <br />consultation with the CWCB staff, the 12 to 15 <br />.-'_ _'-.- .- ..-.-r--_.......,..____. ~ <br />preliminary project systems will be reduced to <br />- -..,..--.---.------.,... -._-_. <br />four semi-final project configurations, including: <br /> <br />a. a maximum system consisting of Western's <br />recommended High Elevation System; and <br /> <br />b. three smaller systems consisting of a minimum <br />and two intermediate project configurations. <br /> <br /> <br />A-43 <br />