Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br />. <br /> <br />6. <br /> <br />Prepare tabulations of: <br /> <br />a. <br /> <br />the San Miguel Project Conditional water rights <br />available for transfer to the project; <br /> <br />b. <br /> <br />water rights in or owned by the J & M Hughes <br />Ditch, the Farmer's Water Development Company, the <br /> <br />Lone Cone Ditch and Reservoir Company, and the <br /> <br />Lilylands Canal and Reservoir Company which may <br />be associated with the project; <br /> <br />c. <br /> <br />major water rights owned by others in the study <br />area; and <br /> <br />d. <br /> <br />instream flow rights, if any, decreed or pending <br /> <br />in the study area. <br /> <br />7. Prepare line diagrams in the format shown on Figure A-2 <br /> <br />for major streams involved in the study Showing the <br /> <br />-relative locations of the direct diversions and <br /> <br />reservoirs, and the larger existing and conditional <br /> <br />water rights associated with each structure. <br /> <br />A-23 <br />