Laserfiche WebLink
<br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />1 <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />This study will be based on existing data and information <br /> <br /> <br />available from the above sources and other sources of <br /> <br /> <br />records available to the public. The plan of study does not <br /> <br />include any new data generation efforts which would require <br /> <br />substantial commitments of either time or expense, such as <br /> <br />installation of stream or diversion gaging stations, <br /> <br />measurements of flows, field instrument surveys, soils <br /> <br />sampling, mapping, geologic foundation drilling or seismic <br />investigations. <br /> <br />METHODOLOGY: <br /> <br />1. <br /> <br />Confer with the CWCB and SMWCD to determine information <br /> <br /> <br />and data which may be available beyond that contained <br /> <br /> <br />in the reports listed above. Identify which data and <br /> <br /> <br />information will be obtained directly by Contractor <br /> <br /> <br />and which will be obtained by the CWCB and/or the SMWCD <br /> <br /> <br />and furnished to Contractor. <br /> <br />2. <br /> <br />Obtain reports, files, tabulations, and other data <br /> <br />determined in Step 1 to be Contractor's responsibility <br />to acquire from the USBR and others. CWCB will obtain <br />relevant information from Western Engineers, Inc. <br /> <br />A-IO <br />