My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153827 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153827 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:03:22 AM
Creation date
10/5/2006 11:45:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153827
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
EIA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />Julesburg Irrigation District <br />Enlargement of Julesburg (Jumbo) Reservoir <br />Estimated Cost of Engineering Services <br /> <br />, <br /> <br />e <br /> <br />Ret Proposal for Engineering Services. dated April 2. 1997 <br /> <br />Task <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />a <br />9 <br />10 <br />l1A <br />11.6 <br />111,C,l <br />/'1,C,2 <br />12 <br /> <br />Task Description <br /> <br />Estimated Man-Hours ' Totall <br />Wheeler Kumar Task, <br /> Cost, <br />I I <br />$474 I <br />600 $1,0741 <br />$948 1270 $2,218 <br />$869 0 $869 <br />$437 0 $437 <br />$1,676 1395 $3,071 <br />$1,580 995 $2.575 <br />$433 0 $433 <br />$615 0 $615 <br />$515 0 $515 <br />$402 0 $4021 <br />$385 265 $6501 <br />$1.368 1095 $2.4631 <br />$1.893 900 $2,793 <br />$1.718 1460 $3.178i <br />$3,7,28 470 $4,198, <br /> I <br />$17.041 $8,4501 $25.491! e <br />~- $0 $300' <br />$25,791. I <br /> <br />evil!!W Old Data <br />leld Trip <br />valuate Rehab of River Divemon <br />valuate Intake Canal <br />econnaissance of Other Dam Sites <br />pstream FacingfWave Protection <br />age Evalua1ions <br />age Control <br />ulesburg Res Hydrology & Spillway <br />ave Height and RunLP. and Freeboard <br />ehab AIt #1 : Monitoring <br />ehab All #2.: Raise NWl to GH 27 <br />ehab AIt #SA: Raise NWL to GH 30 <br />econstruct Alt #38: Raise NWl to GH 30 <br />art <br /> <br /> <br />aterials & Mise Expenses <br /> <br />roject T olal <br /> <br />02-Apr-97 <br />PA0P97,07\COSlPRO.'MG <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.