My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153827 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153827 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:03:22 AM
Creation date
10/5/2006 11:45:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153827
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
EIA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />1 <br />1 <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />I <br />1 <br />1 <br />1 <br />1 <br />I <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />fAX, 13031866,4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />Roy Romer <br />Governor <br /> <br />September 26, 1997 <br /> <br />I~mes S. lochhe,lu <br />Executive DiretlOr, DNR <br /> <br />O.uies C. lile. P.E. <br />Director. eWeB <br /> <br />Mr. Larry Frame, Superintendent <br />Julesburg Irrigation District <br />315 Cedar <br />Julesburg, CO 80737 <br /> <br />RE: Rehabilitation of the Diversion and Headgate <br />Harmony Ditch No. I <br /> <br />Dear Mr, Frame, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />the Colorado Water Conservation Board (CWCB) has approved your request for a $590,000 loan <br />from the Emergency Infrastructure Repair Account. It is our understanding these funds will be <br />used to rehabilitate the diversion and headgate structure of the Harmony Ditch No.1. <br /> <br />The CWCB approved a loan term of 30 years at an interest rate of 3,75%. I have attached a <br />copy of the updated Board memo concerning the Julesburg Irrigation District. Please refer to <br />page 3 of that memo and to the section "Action Taken by the CWCB, September 22, 1997". <br /> <br />The Board made their recommendation subject to several conditions: <br /> <br />a, You must adhere to the CWCB Guidelines for Financial Assistance, A copy of <br />our guidelines has been provided to you. <br /> <br />b, The Feasibility Studv must be comoleted, The study will be reviewed by John <br />Van Sciver of this office (303-866-3441). John will assist you with the study so <br />that the content of the report is in compliance with the Guidelines and statutory <br />requirements, <br /> <br />c, An aooroved contract must be in olace before CWCB funds can be advanced, Jan <br />Illian of this office (303-866-3441) will contact you to initiate the contracting <br />procedure, It usually takes 3 to 6 months to complete contracting, No CWCB <br />funds can be disbursed until your loan contact has been signed by all parties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.