Laserfiche WebLink
<br />II <br />II <br />II <br />II <br />II <br />II <br />~ <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />fI <br />II <br />II <br />II <br />II <br /> <br />Proposed Initial Settling Res~rvoir, Pump Stations, and <br /> <br /> <br />Diversion Structure <br /> <br /> <br />Proposed Modifications to Set,ling Basins <br /> <br /> <br />Proposed Expansion of Filter Capacity <br /> <br />SECTION 5 - WATER DISTRIBUTION SYStEM <br />Description of Existing Syste~ <br />Proposed Improvements in System to Randle 1993 Demand <br />Staged Construction Program for Distribution System <br />Improvements <br />Facilities to be Installed When Required by Development <br />Pressure Zones to be Served <br /> <br />SECTION 6 - ESTIMATES OF COST <br /> <br /> <br />General <br /> <br /> <br />Proposed Backwash Settling Basins <br /> <br /> <br />Proposed Initial Settling Reservoir <br /> <br /> <br />Proposed Pump Stations <br /> <br /> <br />Proposed Diversion Structure <br /> <br /> <br />Proposed Settling Basin Modifications <br /> <br /> <br />Proposed Treatment Plant Expansion <br /> <br /> <br />Distribution System Expansion <br /> <br /> <br />Stage I <br /> <br /> <br />Stage II <br /> <br /> <br />Stage III <br /> <br /> <br />Facilities to be Installed When Required by Devclopment <br /> <br /> <br />Summary of Costs and Timetable for Recollllllended Irro'" ovements <br /> <br />SECTION 7 - SUMMARY AND RECOMMENDATIONS <br />Summary <br />Recommendations <br /> <br />4-2 <br /> <br />4-4 <br />4-5 <br /> <br />5-1 <br /> <br />5-1 <br /> <br />5-2 <br /> <br />5-4 <br /> <br />5-5 <br /> <br />6-1 <br />6-2 <br />6-2 <br /> <br />6-3 <br />6-4 <br /> <br />6-4 <br /> <br />6-5 <br /> <br />6-6 <br />6-7 <br /> <br />6-8 <br /> <br />6-10 <br />6-13 <br /> <br />7-1 <br />7-2 <br />