Laserfiche WebLink
<br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />I <br />I <br />II <br />I <br />I <br />, <br /> <br />PROPOSED PUMP STATION <br />INITIAL SETTLING RESERVOIR TO TREATMENT PLANT <br />COST ESTIMATE <br /> <br />Item <br /> <br /> Quantity Unit Unit Cost Total <br /> 1,450 L.F. $ 28.30 $ 41,035 <br /> L.S. 5,000 <br /> L.S. 141,545 <br />Total Construction Cost $ 187,580 <br />+25% Engineering, Legal & Contingencies 46,895 <br />1973 Project Cost $ 234,475 <br />USE $ 234,500 <br /> <br />30" Transmission Line <br /> <br /> <br />Suction Intake in Reservoir <br /> <br /> <br />Pump Station, 6-250 HP, <br /> <br /> <br />3000 gpm units <br /> <br />PROPOSED PUMP STATION <br />DIVERSION STRUCTURE TO INITIAL SETTLING RESERVOIR <br />COST ESTIMATE <br /> <br />30" Transmission Line 400 L.F. $ 29.00 $ 11,600 <br />Railroad Bore 75 L.F. 160.00 12,000 <br />Reservoir Outlet Structure L.S. 3,000 <br />Pump Station, 3-75 HP, <br />7400 gpm units L.S. 60,210 <br /> Total Construction Cost $ 86,810 <br /> +25% Engineering, Legal & Contingencies 21,703 <br /> 1973 Proj ec t Cost $ 108,513 <br /> USE $ 109,000 <br /> <br />6-3 <br />