Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />SECTION 6 <br /> <br />ESTIMATES OF COST <br /> <br />I <br /> <br />General. <br /> <br />I <br /> <br />I <br /> <br />The cost estimates in this section are based on price quotations for major <br /> <br /> <br />items such as tanks, pump units, and pipe and recent bid prices have been <br /> <br /> <br />used to arrive at the construction cost estimates. All cost estimates were <br /> <br /> <br />developed based on 1973 costs. For improvements recommended in later years <br /> <br /> <br />a 6% per year cost escalation figure was used. Following the itemized cost <br /> <br /> <br />estimates is a section summarizing the cost estimates and providing a recommended <br /> <br /> <br />timetable for accomplishment of the proposed improvements. <br /> <br />I <br /> <br />II <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />~ <br /> <br />t <br /> <br />~ <br /> <br />I <br /> <br />6-1 <br />