My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00251
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:45 AM
Creation date
10/5/2006 11:45:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153375
Contractor Name
Canon City, City of
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />il <br />II <br />il <br />II <br />II <br />il <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />-I <br />I <br />I <br />I <br />I <br />I <br /> <br />Proposed Expansion of Filter Capacity. <br /> <br />The present capacity of the rapid sBnd filters is 10 mgd. Assuming the more <br /> <br /> <br />optimistic population projection, tbe maximum demand will exceed the present <br /> <br /> <br />plant capacity in 1974 when the maximum demand will reach 10.3 mgd. <br /> <br />To enable the plant to keep pace with the future demand it is proposed to <br /> <br /> <br />expand the plant by adding four higb rate sand filters with a total theoretical <br /> <br /> <br />capacity of 12 mgd. Allowing.for bBckwashing and downtime, the .total capacity <br /> <br /> <br />of the entire plant would be 22 mgd which is sufficient to handle the 1993 <br /> <br /> <br />maximum day demand of 21.5 mgd. <br /> <br />The 1973 estimated cost for this expansion BS shown in Section 6 is $500,000. <br /> <br />4-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.