Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />J <br />I <br />I <br />I <br />I <br />I <br />I <br />-I <br />I <br />I <br />,. <br />;1 <br />I <br /> <br />the replacement of portions of the wooden line with steel. Power costs over <br /> <br /> <br />the next 20 years were calcu13ted assuming the pump station would be operating <br /> <br /> <br />in conjunction with the transmission line in the summer months after 1975 <br /> <br /> <br />when the capacity of the raw water line is insufficient to handle maximum <br /> <br /> <br />day demand. <br /> <br />The Table on the following page indicates the maintenance and operating <br /> <br /> <br />expense forecast over the next 20 years for the intake, raw water line and <br /> <br /> <br />pump station. The present worth of the future expenses is also shown. <br /> <br />3-6 <br />