My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00248
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153632
Contractor Name
Gronning Engineering Company
Water District
0
County
Bent
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. '-......, ~ <br /> <br />. <br /> <br />. <br /> <br />EXHIBIT C <br />WORK PRODUCTS <br /> <br />Each of Tasks 1, 2, 3A, and 3B, will have a draft task report as its product, whicl i v i!I <br />present the result of each task with a minimum preamble. These will be submitted initially in <br />draft form. Final versions of these reports will be incorporated into the Phase I Draft <br />Preliminary Report. <br /> <br />A preliminary report will be produced upon completion of Tasks 1 through 4 which will <br />be a self-contained document summarizing all results and providing sufficient discussion to <br />support the conclusions and recommendations. This Phase I Preliminary Report will be due <br />on March 1, 1993. <br /> <br />A draft Study Report will be delivered by June 1, 1993, which will combine the results <br />of Task 5 with the analysis of Phase I. Following receipt of comments, this report will be issued <br />in final form by June 30, 1993. <br /> <br />The numbers of report copies to be submitted will be as specified in the RFP which are <br />as follows: <br /> <br />. Ten (10) copies of each Draft Task Report and related work products as each <br />task is completed. <br /> <br />. Twenty-five (25) copies of a draft and a final Phase I Preliminary Report <br />summarizing the results of Task 1 through 4 by March 1, 1993. <br /> <br />. Twenty-five (25) copies of a draft Study Report by June 1, 1993. <br /> <br />. Fifty (50) printed copies of the final Study Report by June 30, 1, 1993. <br /> <br />. One reproducible original of the final Phase I Preliminary and Study Reports by <br />March 1, and June 30, 1993 respectively. <br /> <br />. One electronic copy of the final report in WordPerfect 5.1 on a 31/2-inch floppy <br />disk. <br /> <br />. Three (3) Technical Appendices, containing: <br /> <br />a copy of any previous report relied upon and or cited in any task or study <br />report prepared as part of this study, if not already held by CWCB. <br /> <br />all technical analyses, calculations, and computer runs conducted as part <br />of this study. <br /> <br />In addition to providing these deliverables, the project team will be available to provide <br />support for and to attend 3 progress presentations to the CWCB staff and interested parties in <br />the Arkansas Valley, plus a final presentation to the CWCB. <br /> <br />bj702.pur <br />
The URL can be used to link to this page
Your browser does not support the video tag.