My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00248
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153632
Contractor Name
Gronning Engineering Company
Water District
0
County
Bent
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f' .. II( '. <br />~\ ~ '.' ~ <br /> <br />. <br /> <br />. <br /> <br />requirement for maximum production of major crops grown, compared to the quantity of <br />water historically available will lead to estimates of the potential of land-to-land transfer <br />within the system. <br /> <br />Alternative 6: Land Fallowing <br /> <br />This alternative can best be evaluated by having stockholders react to various scenarios <br />wherein an annual water demand by buyer or lessee is given and several fallow alternatives <br />are stated. <br /> <br />The elements to be evaluated are: <br /> <br />. Define fallow scenarios: <br /> <br />- remove water from alfalfa for one year (no crop) <br />- remove water from alfalfa for all but one irrigation <br />- plant land used for annual crops with low water use crop (e.g, sudan grass, <br />cover crop) requiring no irrigation. <br /> <br />. Define water allocation with each scertario. <br /> <br />. Identify lands for fallowing. Array the variables and determine values. <br /> <br />. Determine levels of acres committed by fallowing by gradation of soil type, <br />productivity or other selected variables. <br /> <br />. Identify and quantify positive and negative impacts at each level of fallowed <br />acreage. <br /> <br />Alternative 7: Interruptible Supply <br /> <br />The Ft, Lyon operates in five (5) divisions, with extensive lateral systems. Return flow <br />characteristics vary from location to location. Due to this extent of the Ft. Lyon system, <br />interruptible supply alternatives will consider programs for certain segments of the ditch, <br />rather than the entire system. <br /> <br />Analysis will include: <br /> <br />. interruptible supply lands only near the tail of the ditch <br /> <br />. interruptible supply only on lands at the ends of laterals <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.