Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Institutional Considerations <br /> <br />The WVDC has an authorization to borrow $188,000 from the CWCB <br />Construction Fund. The loan from the CWCB is contingent upon the <br />successful negotiation of a contract between the CWCB and WVDC. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep the WVDC from <br />successfully completing this project. <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Feasibility Study <br />Weldon Valley Ditch Diversion Structure <br />July 1997 <br /> <br />8 <br /> <br />I <br />