My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153792 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153792 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:05:45 AM
Creation date
10/5/2006 11:45:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153792
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Institutional Considerations <br /> <br />The WVDC has an authorization to borrow $188,000 from the CWCB <br />Construction Fund. The loan from the CWCB is contingent upon the <br />successful negotiation of a contract between the CWCB and WVDC. <br /> <br />Opinion of Feasibility <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep the WVDC from <br />successfully completing this project. <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Feasibility Study <br />Weldon Valley Ditch Diversion Structure <br />July 1997 <br /> <br />8 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.