My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153792 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153792 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:05:45 AM
Creation date
10/5/2006 11:45:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153792
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Preliminary drawings, by Obermeyer Hydro, Inc., are included in <br />Appendix B. <br /> <br />Water Rights <br /> <br />There are 65 shareholders in the WVDC with rights to divert 165 cfs <br />from the South Platte River. The WVDC diverted a total of 45,496 <br />acre feet in 1993, 49,855 acre feet in 1994, and 40,937 acre feet <br />in 1995, according to State Engineer records. The S.E.O. diversion <br />records are found in Appendix C. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $250,000. Project planning and <br />engineering design will be provided by Jack Odor Engineering. <br />Services. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design coses <br />2. Construction Cost with Contingency <br /> <br />$ 10,000 <br />$240,000 <br /> <br />Total Cost <br /> <br />$250,000 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. Order Pneumatic Structure <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />Date <br />07/01/97 <br />08/15/97 <br />10/01/97 <br />11/15/97 <br />12/01/97 <br /> <br />Social, Economic, and Physical I~pacts <br /> <br />The project will have no significant social impacts. <br /> <br />Although shareholders in the WVDC will be impacted with increased <br />assessments for construction and loan repayment, the project will <br />have a long term positive economic impact by assuring annual <br />diversion of approximately 45,000 acre-feet of water for <br />irrigation. <br /> <br />Feasibility Study <br />Weldon Valley Ditch Oiversion Structure <br />July 1997 (Page revi~ed 9/15/97) <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.