Laserfiche WebLink
<br />5 <br /> <br />, ' <br /> <br />SCOPE OF WORK <br />The scope 0% work involved will be ss outlined in the <br /> <br />"Guildelines" listed by the Colorado Water Conservation <br /> <br />Board for the feasibility reports. The scope of work will <br /> <br />be directed to provide all information required for all <br /> <br />eight (8) chapters 0% the Colorado Water Conservation Board <br /> <br />guidelines. A Cost estimate is attached which outlines the <br /> <br />proposed scope of work and the associated costs broken down <br /> <br />for each chapter of the feasibility report. <br /> <br />Also included <br /> <br />is a proJected proJect schedule through submittal to the <br /> <br />State Engineer's Office - Design Review Branch for review <br /> <br />and approval. This schedule is based on initiation of the <br />proJect by mid June, 1985 such that the Feaaibility Report <br /> <br />can be completed and submitted to the CWCB by October 1985. <br />