My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00241
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:45:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153496
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3 <br /> <br />WORK PL^N <br /> <br />" <br /> <br />The obJective of OUl' "Work Plan" is to provide a solid <br /> <br />approach to the proJect and a <br /> <br />ensure an organized approach <br /> <br />schedule of activities to <br /> <br />to the proJect. <br /> <br />Our "Work <br /> <br />Plan" will adhere to the ~ollowing sequence. <br /> <br />1. Make an initial review of Clark Lake utilizing all <br /> <br />existing information in order to identify problem areas <br /> <br />and scope of work required. <br /> <br />2. Identify potentially critical <br /> <br />conditions <br /> <br />and <br /> <br />initiste <br /> <br />investigations <br /> <br />to <br /> <br />reach <br /> <br />the <br /> <br />primary <br /> <br />conclusions in that regard. <br /> <br /> <br />3. Prepare a schedule of activities such that sll <br /> <br /> <br />partiea will be informed as to how and when critical <br /> <br /> <br />activities will be completed. <br />4. Develop alternate preliminary designs and quantity <br /> <br />estimates as needed to identify the most satisfactory <br /> <br />and economical design configuarations. <br /> <br />5. Prepare all maps, exhibits, and economic analyses as <br /> <br />required to <br /> <br />SUPPOl:'t <br /> <br />the <br /> <br />most <br /> <br />feasible <br /> <br />design <br /> <br />configurations. <br /> <br />6. Prepare the "Feasibility Report" per the CWCB <br /> <br />guidelines such that all information needed to make the <br /> <br />final decisions on the proJect is provided snd <br /> <br />presented in a useable format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.