Laserfiche WebLink
<br />g. 700+ cubic yards of concrete placed in the <br />emergency spillway <br /> <br />h. 5.000~ cubic yards of riprap <br /> <br />i. 50.000~ square yards of topsoil and seeding <br /> <br />j. B.500~ square yards of road surface gravel <br /> <br />The deed will be recorded by the Contractor in the prop~r <br />county or counties and all recording fees shall be paid by the <br />Contractor. The retainage shall not be paid to the Contractor <br />until a warranty deed has been executed. recorded. and filed <br />with the Colorado Water Conservation Board. <br /> <br />6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State. manage. operate. and <br />maintain the project continuously in an efficient and <br />economical manner. and assume all legal liability for such <br />management. operation. and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's interest in the project facilities and <br />any other property identified in paragraph A.5. above. The <br />Contractor shall maintain general liability insurance covering <br />the management. operation. and maintenance of the project until <br />it completes repayment to the State in at least the following <br />amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence. the sum of Five Hundred Thousand Dollars <br />($500,000), <br /> <br />b. For any injury to two or more persons in any single <br />occurrence. the sum of One Million Dollars ($1.000.000). <br /> <br />Said liability insurance shall name the State as a <br />co-insured. A copy of a certificate of said liability <br />insurance must be filed with the Colorado Water <br />Conservation Board prior to the start of the operation <br />of the project system. <br /> <br />8. Make the services of said project available within its <br />capacity to all persons in the Contractor's service area <br />without discrimination as to race. color. religion. or natural <br />origin at reasonable charges (inClUding assessments. taxes. or <br />fees). whether for one or more classes of service. in <br />accordance with a schedule of such charges formally adopted by <br />the Contractor through its elected officers. as may be modified <br />from time to time. The initial rate schedule must be approved <br />by the State. Thereafter. the Contractor may. subject to the <br />approval of the State. make such modifications to the rate <br />schedule as the Contractor deems necessary to efficiently and <br />economically provide for the financial requirements of the <br />system as long as the rate schedule remains reasonable and <br />non-discriminatory. <br /> <br />9. Adjust its operating costs and service charges from <br />time to time to provide for adequate operation and maintenance. <br />emergency repair services. obsolescence reserves. and debt <br />reserves. <br /> <br />10~ Provide the State with such periOdic reports as the <br />State may require and permit periOdic inspections of its <br />operations and accounts by a designated representative of the <br />State. <br /> <br />Page 2 of ~ Pages <br />