Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br /> <:> <br /> ~ <br /> Summary of Juniper project cost allocations and repa;yment ~ <br /> (Unit--$l,OOO) H <br /> Recrea- Fish and H <br /> H <br /> Irrigation Power tion wildlife Total <br /> Cost allocations <br /> Construction costs 8,195 16,593 '4,342 1,198 30,328 <br /> Reimbursable interes~ <br /> during constructio 1 966 966 <br /> Annual operation, maintenance, <br /> and replacement costs 30 132 77 1 240 <br /> Repa;yment <br /> Construction costs <br /> Irrigators 1,475 1,475 <br /> Ad valorem tax <br />-< revenues (Not estimated) g!16,593 <br />-l=" Power revenues 6,720 <br /> 23,313 <br /> Nonreimbursable 4,342 1,198 5,540 <br /> Total 8,195 16,593 4,342 1,198 30,328 <br /> Interest during construction g!966 <br /> Power revenues 966 <br /> Annual operation, maintenance, <br /> and replacement costs <br /> Irrigators 30 30 <br /> Power revenues 132 132 <br /> Nonreimbursable 77 1 78 <br /> Total 30 132 77 1 240 H <br /> Y. Computed at 2.936 percent. i:'l <br /> ?J Costs would be repaid with interest, assumed for this report to be 2.936 percent. l-3 <br /> ~ <br /> I <br /> i <br />