My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00239
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0035X
Contractor Name
Juniper Project USBR 1963
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />CHAPrER III <br /> <br />INITIAL DEVELOPMENT <br /> <br /> <br />Yampa River taken from bridge about a mile east of Sunbeam, Colo. Pump <br />in background is pumping water to lands northeast of Sunbeam. <br /> <br />Because of the smaller irrigation service area, the irrigation diversion <br />requirements at the head of Deadman Bench Canal would be smaller under <br />the initial development than under the comprehensive plan and the water <br />supply available for power production would be larger. Thus the Juniper <br />Reservoir operation would be somewhat different under the initial stage <br />than with the comprehensive development. <br /> <br />Irrigation requirements <br /> <br />Requirements for irrigation diversions and for peak canal capacities <br />were estimated for the initial development in the same manner as discussed <br />for the comprehensive plan in Chapter II. The estimated irrigation require- <br />ments at Juniper Dam for the initial development are summarized below. <br /> <br />Irrigation diversion requirements <br />(Unit--acre-feet) <br /> <br />Month <br />Il,ay <br />June <br />July <br />August <br />September <br />Total <br /> <br />Requirement at turnouts <br />from main canals <br />Total for <br />9,000 acres <br />2,800 <br />8,400 <br />9,600 <br />8,400 <br />4,000 <br />33,200 <br /> <br />Canal <br />seepage <br />and <br />operational <br />losses <br />4,200 <br />3,600 <br />3,400 <br />1,600 <br />1,000 <br />13,800 <br /> <br />Average <br />irrigation <br />diversion <br />requirement <br />at Juniper <br />Dam <br />7,000 <br />12,000 <br />13,000 <br />10,000 <br />5,000 <br />471000 <br /> <br />Per acre <br />0.31 <br />.93 <br />1.07 <br />.93 <br />.45 <br />3.69 <br /> <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.